Indigenous Peoples and Human Rights

November 13, 2017

Camp Makwa's New Solar Office, Frontline Resistance to Tar Sands, Enbridge Line 3

Our first real office is officially up & solar powered at ! Featuring the banner made for the AGM

"We are an Anishinaabe led group of water protectors dedicated to shutting down the construction of the Line 3 pipeline using non-violent direct action. Stand with us to protect our sacred land and waters."
#StopLine3 #WaterIsLife #WildRiceIsLife
"Enbridge’s Line 3 pipeline would transport Tar Sands oil over 1000-miles from Alberta to Superior, Wisconsin with a capacity to transport up to 915,000 barrels per day. The proposed pipeline cuts directly through 1855 Treaty Territory of the Ojibwe Tribes. The proposed pipeline expansion would be Enbridge’s largest project to date."
categories


No comments: