August 29th, 2021
At the end of June the police and criminal justice systems in Northern Minnesota began an escalating and punitive assault on water protectors engaged in non-violent resistance against the Line 3 pipeline. By mid-August this escalation reached the level of torture.
After almost 7 months of ongoing resistance against active construction of Line 3, on June 23rd three water protectors who had locked down to a Horizontal Directional Drill boring under the Straight River were charged with felony theft. Since then nearly 100 water protectors have been charged with felonies and assigned bail amounts ranging from $10,000 -- $50,000 without conditions, and up to $25,000 with conditions.
At the end of June the police and criminal justice systems in Northern Minnesota began an escalating and punitive assault on water protectors engaged in non-violent resistance against the Line 3 pipeline. By mid-August this escalation reached the level of torture.
After almost 7 months of ongoing resistance against active construction of Line 3, on June 23rd three water protectors who had locked down to a Horizontal Directional Drill boring under the Straight River were charged with felony theft. Since then nearly 100 water protectors have been charged with felonies and assigned bail amounts ranging from $10,000 -- $50,000 without conditions, and up to $25,000 with conditions.







